For the past 16 years, Edgewater Site Contracting has worked on many projects that have had everything from incredible geological challenges to unique architectural designs. We take pride in our ability to use unique techniques to help our clients complete their projects both on time and on budget, no matter what the conditions. Here you can read about some of our most recent projects:
Indian Arm
- Boat access only. Barged in all equipment and building materials/supplies.
- Cleared/prepared lot for new house construction.
- Heavy landscaping including installation of a series of dry stack retaining walls.
- Installation of approved septic system.
Eastridge Drive, North Vancouver
| Client | Private Owner
|
| Location | 4750 Eastridge Drive, North Vancouver |
| Date | February 2008 |
| Duration | Project Ongoing |
- 2 acres of steep waterfront cleared in Deep Cove
- Blasting, scaling, and bolting of bedrock
- 400 Truck loads of shot rock generated and removed
- All services for future subdivision installed
- Series of octa-block retaining walls installed (200'+).
Nature's Cove
| Client | Harbourview Projects
|
| Location | 3728 Mt Seymour Pkwy, North Vancouver |
| Date | November 2008 |
| Duration | Project Ongoing |
- Demolition of existing commercial building on site.
- New mixed use development that includes 23 single story units.
Mount Seymour Parkway
| Client | Karnak Productions
|
| Location | 4040 Mt. Seymour Parkway North Vancouver, BC |
| Date | |
| Duration | |
- Involved lifting existing house and utilizing cranes and excavators to insert support beams to suspend house structure.
- Excavated for new basement while house was supported/suspended.
Granville St Demolition
| Client |
|
| Location | 2721 Granville Street Vancouver, BC |
| Date | |
| Duration | |
- Demolition of existing building
- Extremely tight location
- Utilized specialized excavator with "zero tail swing" allowing greater flexibility to work in a confined area.
- Allowed us to demo the building with out effecting Granville Street traffic.
Woodlands
| Client |
|
| Location | Woodlands, North Vancouver |
| Date | |
| Duration | |
- Steep waterfront located in Woodlands, North Vancouver.
- Cleared lot of brush and debris.
- Two large excavators in tandem used to remove material out.
- Blasting of bedrock and excavation for foundation.
- Utilized series of pulleys/towtrucks to maintain excavator on site due to extreme grade of lot.
Furry Creek Subdivision
| Client |
|
| Location | |
| Date | |
| Duration | |
- Backfill of residential foundations in Furry Creek.
- Challenging location due to slope of rock face housing structures are being built on.
- Installation of site services - draintile, water services, etc.
- Installation of dry stack rock walls with excavators.
New Residential Construction (5300 sq.ft.)
| Client | Rommel Homes Ltd.
|
| Location | 943 Beaumont, North Vancouver |
| Date | November 2008 |
| Duration | Project Ongoing |
- Demolition of existing house structure.
- Excavation and site preparation/servies for new construction.
New Residential Construction
| Client | Qualicon Construction Ltd.
|
| Location | 1930 Panorama Drive, North Vancouver |
| Date | October 2008 |
| Duration | Project Ongoing |
- Demolition of existing house structure.
- Excavation and site preparation/services for new construction.
Past High Profile Projects
Iona Island Sewage Outfall Jetty
| Client | Vancouver Pile Driving Ltd./GVRD
|
| Location | Richmond |
| Date | 2006 |
- Supply/install slope protection & repairs for sewage outfall jetty.
Ocean's Crest
| Client | Parklane Homes Ltd.
|
| Location | Furry Creek |
| Date | 2007 |
- Multiple residential site excavation and blasting for Ocean's Crest subdivision in Furry Creek.
North Vancouver Mudslide
| Client | District of North Vancouver
|
| Location | Riverside Drive, North Vancouver |
| Date | 2005 |
- Debris removal/cleanup
- Remedial work and stabilization of slope.
WigWam Inn Debris Torrent
| Client | Royal Vancouver Yacht Club
|
| Location | North end of Indian Arm |
| Date | 2007 |
- Water access only.
- Approximately 5 months of clean-up, remediation and stabilization due to debris torrent.